Technical Advice

Pre Construction

 

  • The building design is assessed to review effectiveness of first principles such as: water shedding of horizontal elements, effectiveness of flashing and cavity systems, potential for differential movement in waterproofing elements.

  • Recommendations of most appropriate waterproofing detailing and membrane solutions.

  • Facilitated workshops are conducted to co-ordinate the inputs of the various stakeholders.

 

Remedial

 

  • Determination of cause of water entry.

  • Consideration of strategic and technical options.

  • Selection of optimum materials and systems.

  • Drafting of technical and contract documents.

  • Selection of contractor.

  • Quality assurance inspections and drafting of maintenance plans.

  • Analysis and repair of consequential damage to concrete stone and finishes.